We split up our backup jobs and stagger them throughout the night. After each job is run, we have secondary processing to copy the backup to tape
Our Tape Library has 2 drives. We have set up parallel processing on the media pools, and set the option for parallel processing in each job stream.
Here is where the problem lies... If a Copy to Tape job is running that will copy 2 servers to tape, each server backup gets assigned 1 tape drive. If 1 server finishes, the drive remains locked to the job, but that drive is also unused until the job fully completes.
If another job needs to write to tape, it cannot grab this now unused resource until the first job completes fully
Is there a way to have Veeam free up the drive resource when it is not needed?
What are the best practices to using 1 library for several copy to tape jobs? We don't want to slow down the copy to tape by limiting the number of drives available, we just want Veeam to recognize that the second drive is no longer needed for the first job and can allocate the drive to another job
We split up our backup jobs and stagger them throughout the night. After each job is run, we have secondary processing to copy the backup to tape
Our Tape Library has 2 drives. We have set up parallel processing on the media pools, and set the option for parallel processing in each job stream.
Here is where the problem lies... If a Copy to Tape job is running that will copy 2 servers to tape, each server backup gets assigned 1 tape drive. If 1 server finishes, the drive remains locked to the job, but that drive is also unused until the job fully completes.
If another job needs to write to tape, it cannot grab this now unused resource until the first job completes fully
Is there a way to have Veeam free up the drive resource when it is not needed?
What are the best practices to using 1 library for several copy to tape jobs? We don't want to slow down the copy to tape by limiting the number of drives available, we just want Veeam to recognize that the second drive is no longer needed for the first job and can allocate the drive to another job
-
- Product Manager
- Posts: 14715
- Liked: 1702 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: Tape Job keeps drive resources locked when no longer needed
Hello Scott,
Thanks for sharing the case, we will investigate this behavior with RnD folks. Can you please upload the logs to the case, looks like we got nothing to look at
Thanks for sharing the case, we will investigate this behavior with RnD folks. Can you please upload the logs to the case, looks like we got nothing to look at
-
- Influencer
- Posts: 10
- Liked: 1 time
- Joined: Sep 19, 2019 2:42 pm
- Full Name: Scott Sowa
- Contact:
Re: Tape Job keeps drive resources locked when no longer needed
I have uploaded the logs of our tape proxy that experienced the issue a couple nights ago
-
- Product Manager
- Posts: 14715
- Liked: 1702 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: Tape Job keeps drive resources locked when no longer needed
Hello Scott,
We need full Veeam B&R log bundle (not only tape proxy logs). Support folks will get in touch with you to provide assistance in collecting the needed information. Stay tuned.
We need full Veeam B&R log bundle (not only tape proxy logs). Support folks will get in touch with you to provide assistance in collecting the needed information. Stay tuned.
-
- Influencer
- Posts: 10
- Liked: 1 time
- Joined: Sep 19, 2019 2:42 pm
- Full Name: Scott Sowa
- Contact:
Re: Tape Job keeps drive resources locked when no longer needed
I uploaded a full log.
To be clear, the previous log was the tape proxy and the backup and replication server. I was attempting to limit the amounts that would have to be culled through
To be clear, the previous log was the tape proxy and the backup and replication server. I was attempting to limit the amounts that would have to be culled through
-
- Product Manager
- Posts: 14715
- Liked: 1702 times
- Joined: Feb 04, 2013 2:07 pm
- Full Name: Dmitry Popov
- Location: Prague
- Contact:
Re: Tape Job keeps drive resources locked when no longer needed
Hello Scott,
@SSowa We've tried to confirm parallel processing the issue in the lab with latest v11 cp2 but no luck, folks were not able to indicate any signs of this issue via the logs as well. Can you please try to reproduce this behavior again (ideally with v11 plus latest cumulative patch installed)? In case you see the same behavior please note the time stamp, job name and devices in use (the screenshots will help too) and share all that with me. You can ping me directly via PM or via support team what works the best. Thank you in advance!
@SSowa We've tried to confirm parallel processing the issue in the lab with latest v11 cp2 but no luck, folks were not able to indicate any signs of this issue via the logs as well. Can you please try to reproduce this behavior again (ideally with v11 plus latest cumulative patch installed)? In case you see the same behavior please note the time stamp, job name and devices in use (the screenshots will help too) and share all that with me. You can ping me directly via PM or via support team what works the best. Thank you in advance!
Who is online
Users browsing this forum: Bing [Bot] and 24 guests