Hi all,
I get the error occasionally "incremental copy was not processed during previous copy interval".
- this is from a backup copy job
- the copy job is set to start each night at 10 pm (so as to save bandwidth to our offsite)
- it is a periodic copy
Question: will VBR "catch up" so that all incrementals will be in the chain after the next successful copy job? Or do I have to trigger a full backup or something?
Thanks.
-
- Enthusiast
- Posts: 54
- Liked: 2 times
- Joined: Jun 12, 2015 3:34 pm
- Full Name: McK Admins
- Contact:
-
- Product Manager
- Posts: 9394
- Liked: 2502 times
- Joined: May 13, 2017 4:51 pm
- Full Name: Fabian K.
- Location: Switzerland
- Contact:
Re: Question re incremental copy not processed
Hi McK Admins
The backup server will try to copy the most recent restore point again when it starts the next interval (v11) or according to the schedule (v12). But it won't copy all missed incremental backups. If you want to make sure that you have "all restore points" copied, use an immediate backup copy job.
Best,
Fabian
The backup server will try to copy the most recent restore point again when it starts the next interval (v11) or according to the schedule (v12). But it won't copy all missed incremental backups. If you want to make sure that you have "all restore points" copied, use an immediate backup copy job.
No, just make sure that the source backup job is finished with creating the restore point when the backup copy job starts. And that the copy job must have enough time and bandwidth available to copy a single restore point within your copy time window.Or do I have to trigger a full backup or something?
Best,
Fabian
Product Management Analyst @ Veeam Software
-
- Enthusiast
- Posts: 54
- Liked: 2 times
- Joined: Jun 12, 2015 3:34 pm
- Full Name: McK Admins
- Contact:
Re: Question re incremental copy not processed
Hi,
- it looks like I can't switch from "periodic copy" to "immediate copy" now that these copy jobs have been running; is there a way to do that or do I have to re-create the copy jobs from scratch?
- can I still set the schedule to be within a time frame e.g. 8 pm to 7 am? This was to control bandwidth during working hours. The backups happen mostly between 10 and 11 so given your last comment ("make sure the source backup job is finished"), does this mean that I should set the schedule to be more like 12 am to 7 am?
Thanks,
Albert
- it looks like I can't switch from "periodic copy" to "immediate copy" now that these copy jobs have been running; is there a way to do that or do I have to re-create the copy jobs from scratch?
- can I still set the schedule to be within a time frame e.g. 8 pm to 7 am? This was to control bandwidth during working hours. The backups happen mostly between 10 and 11 so given your last comment ("make sure the source backup job is finished"), does this mean that I should set the schedule to be more like 12 am to 7 am?
Thanks,
Albert
-
- Product Manager
- Posts: 9394
- Liked: 2502 times
- Joined: May 13, 2017 4:51 pm
- Full Name: Fabian K.
- Location: Switzerland
- Contact:
Re: Question re incremental copy not processed
Hello
The copy job should wait if the source job still has locked the backup files. After backup files are released by the source job, the copy job resumes to copy those restore points.
Scheduling at the same time is possible. But I would still wait to start a periodic copy jobs till the source job has finished it's copy.
Instead of using backup copy window, you could also use traffic rules to limit the traffic a backup copy job can use. This will save bandwidth to the remote site, but still allow backup copy jobs to run longer during the day.
https://helpcenter.veeam.com/docs/backu ... ml?ver=120
Best,
Fabian
Switching period to immediate and back was not possible with pre-v12 backup copy jobs. The new copy job type is required.- it looks like I can't switch from "periodic copy" to "immediate copy" now that these copy jobs have been running; is there a way to do that or do I have to re-create the copy jobs from scratch?
Are you on V11 or V12? What backup format does the source and copy job use? per-machine or Single-file backup (per-job backup chains).- can I still set the schedule to be within a time frame e.g. 8 pm to 7 am? This was to control bandwidth during working hours. The backups happen mostly between 10 and 11 so given your last comment ("make sure the source backup job is finished"), does this mean that I should set the schedule to be more like 12 am to 7 am?
The copy job should wait if the source job still has locked the backup files. After backup files are released by the source job, the copy job resumes to copy those restore points.
Scheduling at the same time is possible. But I would still wait to start a periodic copy jobs till the source job has finished it's copy.
Instead of using backup copy window, you could also use traffic rules to limit the traffic a backup copy job can use. This will save bandwidth to the remote site, but still allow backup copy jobs to run longer during the day.
https://helpcenter.veeam.com/docs/backu ... ml?ver=120
Best,
Fabian
Product Management Analyst @ Veeam Software
Who is online
Users browsing this forum: Baidu [Spider], Bing [Bot] and 243 guests