Forgive any ignorance, I setup a GFS tape job at my DR site and it has been running for a few weeks now successfully. I notice that it has a next run time scheduled. I just created two new GFS jobs at my main site and both of them show not scheduled.
Will they schedule themselves and automatically run this weekend as planned, or do I need to do something to make them run?
I will be so glad if these work the first time. I am replacing a total of 9 tape jobs with two GFS tape jobs. So much cleaner, if it works.
Will they schedule themselves and automatically run this weekend as planned, or do I need to do something to make them run?
I will be so glad if these work the first time. I am replacing a total of 9 tape jobs with two GFS tape jobs. So much cleaner, if it works.
-
- Influencer
- Posts: 13
- Liked: 1 time
- Joined: May 28, 2015 8:48 am
- Full Name: Rene Meyer
- Location: Denmark
- Contact:
Re: GFS Tape job 'not scheduled'?
The only thing I can think of is if you didn't set and "retention periods" (weekly/monthly/quarterly/yearly) under the media pool in the "GFS Media Set" view
else it should schedule it self if it's enabled that is
else it should schedule it self if it's enabled that is
-
- Product Manager
- Posts: 20400
- Liked: 2298 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: GFS Tape job 'not scheduled'?
As long as a job has a schedule set up for it and is pointed to the GFS media pool, the Next Run field should be reflected correctly. Though, it usually takes few seconds for a newly created job to update that parameter. Thanks.
-
- Influencer
- Posts: 23
- Liked: 5 times
- Joined: Aug 05, 2015 1:41 pm
- Full Name: Jason Taylor
- Contact:
Re: GFS Tape job 'not scheduled'?
Hm, retention periods are set and it's been a reboot and a day and it still isn't scheduled. Guess something's wrong, I'll open a ticket with support.
-
- Product Manager
- Posts: 20400
- Liked: 2298 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: GFS Tape job 'not scheduled'?
Yep, the described behaviour does not look expected, so opening a ticket is the right thing to do. I'd appreciate if you post the case number, once you get one. Thanks.
-
- Influencer
- Posts: 11
- Liked: 2 times
- Joined: Feb 19, 2015 2:33 am
- Full Name: Shane Ley
- Contact:
Re: GFS Tape job 'not scheduled'?
I'm having the same issue as this, where the GFS Tape job's Next Run shows as <not scheduled> if 'last' is chosen as day of month. If I change it to a day, such as 31, then it correctly shows the scheduled date.
I have disabled Weekly and Quarterly, so I haven't tested whether this problem occurs with those enabled.
Case 01787954
I have disabled Weekly and Quarterly, so I haven't tested whether this problem occurs with those enabled.
Case 01787954
-
- Product Manager
- Posts: 20400
- Liked: 2298 times
- Joined: Oct 26, 2012 3:28 pm
- Full Name: Vladimir Eremin
- Contact:
Re: GFS Tape job 'not scheduled'?
Thank you for posting your ticket number. We've already notified our QA team about the said problem.
-
- Novice
- Posts: 5
- Liked: never
- Joined: Jan 29, 2016 1:12 am
- Full Name: Paul Verburg
- Contact:
[MERGED] GFS Tape job last day of month wont schedule
HI,
When I create a GFS tape job to run on the last day of the month it comes up as not scheduled ????
What am I doing wrong
B&R 9.0.0.1491
Paul V.
When I create a GFS tape job to run on the last day of the month it comes up as not scheduled ????
What am I doing wrong
B&R 9.0.0.1491
Paul V.
-
- Expert
- Posts: 221
- Liked: 48 times
- Joined: Nov 27, 2015 2:26 pm
- Full Name: Konstantin
- Location: Saint Petersburg
- Contact:
Re: GFS Tape job last day of month wont schedule
Hi, Paul!
This is a known behaviour, please contact our support team to obtain a hotfix. As a workaround you may configure the job to run on 30th day of the month.
Thanks.
This is a known behaviour, please contact our support team to obtain a hotfix. As a workaround you may configure the job to run on 30th day of the month.
Thanks.