That`s a workaround, not a fix
Probably the support engineer was not aware yet of the fix, since it was only promoted to the support team this morning.
Please escalate your case with "Talk to Manager" option on the customer support portal.
Brilliant rapid response time from support for a level 3 severity downloaded the 'fix' but, a little confused by the email text
"The fix won't touch already changed scheduling." does this mean we still have to go through all the jobs & reset manually still?
This answer means that if you did not touch this option after update to 9.5, you will get your option from 9.0 back.
If you already modified that schedule for some job, newly applied options will stay intact and will not change back to the ones that you had before.
what now is the upgrade process to 9.5? I'm starting from 9.0.0.1491
do we upgrade to 9.5.0.711, get bit by this schedule bug, then open a support case to get the hotfix? Or does Update 1 (released today) resolve the issue? Do I need to manually fix the broken schedules?
Great. Can you tell me if i apply the update immediately after the 9.5 upgrade, will my schedules be intact, or should i expect to manually fix them? Thanks again.
Your schedules should be intact in this case.
If by any chance you find them reset after the update to v95u1, don`t change them back manually, but contact the support team. But again, it`s expected that the job options don`t change.
Thanks!