This has probably been requested/asked before so I apologise for asking again if it has.
When scheduling a tape job I can see that I can select to run "After this job" I am then able to select a backup job. What I want to be able to select is a copy job as a number of the tape jobs we have take a couple of days to complete and I use the copy job so that the actual backup is not impacted. I currently schedule the jobs to run at a specific time but for a handful of jobs would prefer to run after the copy job completes.
Thanks
This has probably been requested/asked before so I apologise for asking again if it has.
When scheduling a tape job I can see that I can select to run "After this job" I am then able to select a backup job. What I want to be able to select is a copy job as a number of the tape jobs we have take a couple of days to complete and I use the copy job so that the actual backup is not impacted. I currently schedule the jobs to run at a specific time but for a handful of jobs would prefer to run after the copy job completes.
Thanks
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Schedule a tape backup to run after a copy job
Hi Paul, are you saying you do not see your backup copy jobs in the list when selecting "After this job"?
-
- Veteran
- Posts: 282
- Liked: 25 times
- Joined: May 22, 2015 7:16 am
- Full Name: Paul
- Contact:
Re: Schedule a tape backup to run after a copy job
That is what I was saying however I have just seen that the copy jobs are shown after the backup jobs. I was expecting them to be in alphabetical order.
Please excuse my stupidity
Please excuse my stupidity
-
- Veteran
- Posts: 282
- Liked: 25 times
- Joined: May 22, 2015 7:16 am
- Full Name: Paul
- Contact:
Re: Schedule a tape backup to run after a copy job
Hmm. Just checked again and actually looked properly this time. I cannot see any copy jobs as options to run the tape job After this job. I can only see backup and tape jobs as options.
-
- Veeam Software
- Posts: 21139
- Liked: 2141 times
- Joined: Jul 11, 2011 10:22 am
- Full Name: Alexander Fogelson
- Contact:
Re: Schedule a tape backup to run after a copy job
If those backup copy jobs were created by the same Veeam B&R instance, you should see them there. I suggest asking support to take a closer look.