
For my setup in this scenario I always want to run full backups... never incremental.
I have a schedule set to perform a full backup to "pool 1" tapes
Instead of running a full to pool 1... Veeam B&R keeps trying to start an incremental job to pool 2 tapes. No schedule is set for incremental.
I'm willing to consider this may not be an issue and it's misconfigured... but I'm struggling to see what the problem is. Anyone have any ideas?
Here's the job running:
n.b. you can stop the job and run it again from scratch and it will quickly return to this WaitingTape status

SEE (Incremental) in brackets next to the job name.
You can see it wants me to add a tape. That's because those tapes aren't in the library. The requested tape is in pool 2 and that's not currently loaded because I don't want to write to pool 2 tapes.
This is the main screen for tape jobs. I've blanked out the details of my setup as I don't want the details visible on the internet... but behind the blocked out target section is a target which is displayed like this: "Pool 1 [Pool 2]"

You can see here, my Full Backup screen has pool 1 selected and there is a tick in the checkbox to run the job automatically.

Incremental Backup screen shows Pool 2 is selected and the checkbox for running the job is un-checked.

So either I've missed something important or there is something unusual going on here... what's the consensus?